BNK Petroleum spuds Glenn 16-2H well
Friday, Jan 12, 2018
BNK Petroleum Inc. has announced that the Company has begun drilling the Glenn 16-2H well in the Tishomingo Field with Power Rig #7.

The Company has a 100% working interest in the Glenn 16-2H, which is located directly south of Brock 9-2H well and is the first well in the 2018 drilling program. The well is expected to take about 30 days to drill. Once drilling is complete, the rig is scheduled to move to the Scott 14-2H location which is about two miles to the east of the Glenn 16-2H. Fracture stimulation of the Glenn 16-2H well will be scheduled as quickly as possible.

Wolf Regener, President and CEO, commented, “We are looking forward to the continued success of our drilling campaign, which we believe will continue to increase our cash flow and reserves.”

For additional information on this project, please visit our ProjectsOGP database

Member Profiles

Featured Profile

Featured Videos

Featured Case Studies